Client: UAB „Viados NT“
Services: Concept Design, Technical Design, Detail Design
Year: 2020-2021
The gas station is being designed in two land plots. In the western part of the plot, there will be two underground liquid fuel tanks and one liquefied gas tank. A fuel intake collector is designed above the tanks. On the north side, two islands with heavy fuel refuelling stations are being designed. In front of the operator’s building, a lightweight constructions roof is provided for the rain protection. There are two charging points for electric cars. Partition structures, heating, ventilation, cooling, lighting, domestic hot water systems met the requirements for energy efficiency class A+.