Biofuel boiler house installation

Posted on Posted in Design

Overhaul project of other purpose buildings – boiler room and laundry room, Stoties str. 14, Dūseikiai village, Tryškių neighbourhood, Telšiai District Municipality
Client: Dūseikių socialinės globos namai
Completion: 2016

The project is intended for biofuel boiler house installation in Dūseikiai social care houses. The project is defined as Overhaul project of other purpose buildings – boiler room and laundry room, Stoties str. 14, Dūseikiai village, Tryškių neighbourhood, Telšiai District Municipality.
Biofuel boiler is installed in the laundry building (fitted with two 0.5 MW biofuel boilers with integrated furnace and control panels).
Biofuel warehouse for the storage and transport of biofuels is installed in boiler building (two or more segments; with moving floor).
Two 500 kW thermal power (together with economizers) water boilers fired by wood chips is planned to be installed in the existing boiler building premises. One boiler is working as the main one, the other as a backup. Biofuel warehouse is planned to be installed in the separate room of existing boiler building and biofuel boilers in the separate room of the laundry room, which is next to the boiler building.